Sunday, November 3, 2013
summer work program pt. 1
these are from the summer fun work program we joined up to finish our basement. the top pics show the studs and framing going up. also, you can see dave's bus parked out back. that was part of the landscape for about three months. when he left, it looked strange to look out back and not see it. also, you can see the tub that still doesn't work that was installed back in august. we'll still trying to get a motor for this thing to work. i don't recommend buying anything from kohler. pass on them.
but i'll be posting more pics of our summer work as we go through the month. i finally got time to upload all my pics from my camera. enjoy! oh yeah. i had to add one pic of the hairy beast that was lurking in the basement. that's her on the orange tarp. she still lurks inside these walls!
Subscribe to:
Post Comments (Atom)

No comments:
Post a Comment