Tuesday, December 31, 2013

summer work program, pt. 2






okay! so it's been a while since I posted more pictures of the house from this summer. where we last left off, we had framed the rooms and I believe we either done with the wiring or we were still completing the wiring. but I don't any pictures of the wiring process, but it's boring. therefore, we have jumped ahead the insulation process! yes, we insulated the rooms. and boy did we. because now when it's really cold in the house and we crank up the heat, these rooms get super hot while it's still cold upstairs. but that's because we need to add insulation to the upstairs, which is a job for 2014. either way, you can see the bottom picture is the finished room even with the paper on the floor ready for the drywall to go up. and you probably guessed it, the next round of photos will be when the room is drywalled.
 
 
 
I realized I didn't have a picture of sofie doing anything during this process. so here she is in my old sock box, which originally was a hat box. it doesn't matter to her. it's small and comfortable. 

No comments: